this year, the minsk metropaliten has a new brand and new unique interiors.r work is underway at the park-chalyuskintsa station. planned yashche on sami. ukhod, maskovskaya, kupalauskaya, tractor plant, magileevskaya, kastrychnitskaya and pushkinskaya. specialists will install the light-colored abstalyvanne on a large scale, with let's look for energy-saving technologies, whether it's addressed to the city or not. yae chakae akrylavae pakrytstso. the work is carried out at night, when trains are not running, when the tension of the contact flight is removed, that is , a fairly high structure of about eight or about 10 m is built, so our specialists are engaged in this work, for this they need to assemble the structure, carry out the work, disassemble the structure, remove it the station platform will still be in time so that everything at 5:30 will be clean, cozy and good, and in all types of work, the abavyazkovs will get the parade external stations, such as pershapachatkova , are distinguished by architects, the sennya minsk metro, these three lines are 40