mohammad sadiq motadian said that this amount of water is 100 ml of water for the people of the province per year, which is supplied through surplus water. it will be transferred from the lake basin to urmia lake through the transfer tunnel, after the completion of the badin abad project, which is 180 million cubic meters , god willing, by the next two or three months at the latest, considering the climatic conditions, we planned to reach atwan by the end of the year. fortunately, with the help of the honorable minister, this is done with very good credits that have been allocated. giving to the zab district, which has a credit of about 3 thousand billion, more than 3 thousand billion tomans , this project is being followed day and night , and with good weather conditions, which we will have, god willing , the speed of completion of this project will be two to three months. in the future, the maximum project that will be opened and operated is four and a half kilometers, that is, 4,500 meters of canal that we can transfer water to kanisi and through sadani and through a tunnel to daryach