a raishuural scale, and who will do smart work for the assimilation of a pumping station on montazhnikov street artesian from the water intake of the vinskoy tire, islands and felician spots will be served here with the residents through pipes from the reservoirs, a pump is brought to the gray minsk with such a tire and artesian water. now we are in the process of laying water pipelines, these will be connection points. eny of moscow wells themselves will be re-drilled in the area of the water supply system, we also plan to start, somewhere by may. uh, let's start drilling. they will be in the water intakes of three water intakes in the city of minsk, so the work will also be carried out. uh at the same time. uh, let's say the minimum. there, probably, five or seven wells are being worked near the minsk region not far from the village of self-praise, because the shei large-scale underground structure is beyond the borders, so the pukhovitsky uzinsky district itself is installing a water supply system for about 150 people. visual information tables for voiced routes of a battered layout and it