mr. atkinson is usually on the other side. i think in this case, i have an idea that would solve the problem. even if you will grant and uphold our permit to put either and open metal rail or a glass rail that is clear, which are permit allows us to do, if you will uphold that permit, i will put translucent glass in the elevations of the debt that face the appellants property so that all the west side glass would be glazed with translucent glass. you cannot see through it, but light goes through it. if no one appeals the use of that translucent glass, we are done. if someone appeals it, we will come back to you and you can ask me to notice the translucent glass. but if we walk out of here tonight without the ability to move forward on the web -- on a permit that has been a year in the making, through no fault of our own, i think we already severe disadvantage. after we have gone through a process that was carefully researched, that was carefully reviewed by the department, that was carefully planned-checked, and checked in the