mr. boscovich, i do not know. i will talk to him tomorrow. i let him away early. i was a little bit confused when i saw the brief in regards to the property line. there is a complaint that it complied with the dbi about 2323 hyde st. about these windows and the legality of them. i went to look at the complaint and tried to get myself appointed for today. there is something going on with regards to this easement and the area because the property line is not really shown on the plans. i believe that has gone through some sort of core process at this time. it is the first phase of the work. i do not know whether the building code would require this wall in this location. because this is the first part of the permit. i do not see the rest of the permit. there is not enough information for me to say that. if anyone has any questions, -- president garcia: why was a permit issued for a wall? >> you can apply for a permit like that if you want to spread it out. if you want to build a wall, you can build a wall. it is up to your neighborhood if they do not like that. that