am asking that letter be clarified, but to go through the other issues of timing, basically what mr. bryan said was about was the only issue. i recognize we made a lot of progress. the timing issue is of concern, because if you look of the original note is to repair a sidewalk, it was issued. it is that a repair within 30 days, -- it asked that the repair be made within 30 days. now they are asking for nine and a half months. the other thing is i actually contacted jodi about the timeframe for a typical sidewalks, and she said usually it is 30, 60, or 90 days, but not beyond that, and i have a copy of the permit for some other work they did last year. they started out in october, and they finished in december. it is not the same thing, but they got it done in two months. i think that is relevant your good -- that is relevant. while i support this, the reason i think it is appropriate to put a time frame on, they are making a compromise. they mentioned the encroachment was long standing, but actually, in 2004, usf constructed the retaining wall without a permit, and i want to be clear, beca