mr. bulcovich he expressed shock and dismay, that the owner had not informed him that this work was happening. despite his earlier admonition, dbi ordered the work to stop, the soils were disrupted and diluted the pattern continued there was a soil study conducted by a qualified lab and we honor that study and the respect for the people that conducted it. however in the test itself it concludes in the last paragraph the information and they go on to give no guarantee of the accuracy that have report. we will never know what was removed from the site and that is problematic. on january 16th, the applicant was seen preventing a building inspector from entering the building. the police department was called out and contractors dispersed. the location was discovered to have new work and new demolition work. the pattern continued and a new stop work order and novs were issued. i believe that we have exceeded the requirement of new evidence and identified new witness and outlined a clear deception in the original hearing all of which support the request for a rehearing. i thank you for your conside