mr. cassidy, let me ask my question. when you opened up the building, did you find that a member sizes changed from your original exploration would have indicated? >> every set instead is the original size -- every second stud is the original size. you can see it all of the way along. there is a new study here, but they are all new, too -- there is a new studys -- tud -- stud here. >> every second one is a different size. they have to be added on the bottom floors. in the middle floors, to buy for a cure your quotes i have seen out for the floor, -- two by four. i have seen that in the floor. it has to be beefed up to come to code. did you are not allowed to demolish donthem. >> back to the out last point, you have to assist with something? >> sometimes they would add additional structural members, depending on what the engineer asks for. >> i thing is submitted. >> unless their is department will rebuttal. anything else? then yes, it is submitted. >> when i first read this package, it was interesting, because i thought