mr. donofrio. >> good evening, commissioners. thank you very much for your patience on what i'm sure has been a long evening for you. we have an incorrect scope of demolition depicted and an incorrect story count, even an incorrect cost of what this story is going to cost. most significantly, the concern is that the removal of the eastern wall, which as we've heard from mr. duffy if it's wood against soil could create problems. the removal of that wall raises significant demolition and float stability issues. and yes, these are issues that we have raised in other forums because of the concern about this uphill reservoir, the impact on neighboring properties. and what we were told by planning at the board of supervisors was that, "due to the on-site slope, the project is subject to heightened review by d.b.i.'s structural advisory committee." yet now we are hearing from mr. sanchez that planning didn't guarantee us that we're going to go to structural advisory committee. secondly, a geotechnical report would be required before a b