mr. duffey >> good evening, commissioners. for the chief permits that are before us this evening and to date they seem to have been approved and that's correct it's all seismic and structural issues we have hanson tom with me tonight he's a dbi principal and engineer and he'll address the seismic issues on the building permits. thank you >> mr. tom. >> thank you, commissioners. good evening. i'm hanson tom i'm the principal engineer with the department of building inspection. the issue here is the 5 permit issues the department of building inspectors guidelines when we reviewed the site permit the design criteria which is the because of the design needs to obtain approved before the issuance of the building process. the design actually requires the engineer of record to show us the proposed building and did structural system of the building and the proposed a novels and methodology and acceptance criteria and anything else expectation to the prescription of the building code has to be specified to all those design we have to t