so mr. dykes. thank you for leading us off today. >> thank you. supervisor wiener and cohen.'s my pleasure to be here. thank you. i'm the principle engineer at tjpa and i have been involved in this design and project for seven years as a member of tjpa. and for some years before as a consultant. just a quick recap. elements of the project, the downtown extension starts at grade down near colman street and the tracks, two tracks are peeled off parallel to 7th street and reach of the beginning of the tunnel portal beyond 6th street, having go underneath the 6th off-ramp from the freeway. this is now fairly shallow cut-and-cover work to build an underground station at 4th and townsend and then still cut-and-cover until we get to 3rd street, where we are turning left into 2nd street and arrive at rock or soft rock rather than water and mud, which we have had up to this stage. so it's a mined tunnel. actually the best rock on this sandstone. it stops being a mine tunnel when we run out of rock at the other end, beyond folsom street, halfway to howard street. also at that stage, th