mr. flanagan briefly touched upon this project. there was concern from the public about talking about the deeper? >> this action, this work that we're doing is largely in response to concerns, one of which we heard being that there is some pressure to go forward with choosing a policy action sooner rather than later, as we do have a bridge that does need to be replaced and we need to learn more, if we go with closing this bridge, we need to be clear that the connector road option would work. one of the concerns that we heard was that we were doing this in the wrong order in when needed to do a luminary work on reviewing these options. so, that is why we are here today. secondly, concerned about how the connector road would fit in with gerald avenue and other street work going on in that area, reconfiguring intersection. we are taking a good look at coordinating with the produce market and bring it back to the community in response. supervisor avalos: thank you. it could very well be that we have a choice between three options and r