mr. hamberger was clear, at that moment in time. >> yes, supervisor, that is correct. but we also asked for a more current assessment as well. so we can bring up-to-date where the building is now. in terms of the safety. d.b.i. inspectors conduct life safety inspections every six months and the next one is scheduled for about june or july next year. so it will be more than likely next month. and i'm missing a sheet so i will just put this here. what is happening now? we have three permits issued to conduct exploratory work to determine existing conditions and collect concrete core samples. they occur in location of the shoring wall, the mat foundation, basement wall of the podium structure. this work has started on two of the permits and we have several inspections that have been conducted by our staff. so i think i would like to stop there because i think that presents at least a snapshot where we are, where we have been and where we are going with the information sheet s-18 especially with the two geotechnical experts required and also the monitoring. those are power