mr. joslin will elaborate.k the planning commission has some desires about reducing heights in certain places. i don't think they had a lot of-i think they were flexible and how he was a cheap it was an engineer inch over there. >> okay. that mr. joslin can address it but that the last point then is during the course of the meetings with the rdt and further on from that, were there larger contextual drawings showing site plans, street elevations? >> yes. the original for any type of building permit like this, as part of the plan submittal we require that you have essentially a site plan that shows adjacent properties and buildings elevations that show adjacent buildings as well. >> i know that's what the drawing requirements are but did your staff require expansion of those types of drawings you could see the context along the street frontage? >> expansion, how exactly? wider scope? >> yes >> i don't know if that was part of the required submittal. i know that we do have a lot of tools of able to us to see that