mr. lebrun. >> thank you very much. >>clerk: bruce? >> thank you for listening. i was here last week, and i made a statement. mr. peskin, i think that's your name, if i could hear it correctly. >> director reiskin: reiskin. peskin is a totally different person. >> i apologize. so of course, you made some very interesting points that i'd like to get back into depth. you said you weren't here last week. i can't remember if you were or not, and that is that these major girders are the principle members that held up everything below and above, and the notion is one cracked all the way through, and another one cracked partially through. so you can moment that the 2k3w girder had no movement capacity. therefore, others bore a secondary load, so there's been no specific announcement beyond the girder that anyone is going to look into the secondary load path, the possible yielding, the possibly loading problems, so i just wanted to say because of your investigateative minds, it's not going to be the girder, it should be the secondary load that should be published. the id