mr. michael white, of michael white general contractors, submitted the plans to dbi for a permit, which was granted on august 31, 2011. the appeal is aimed at assuring the safety of the supporting roof structure directly below the rooftop deck. the permit holder, mr. baristas, has responded to the appeal and has hired a civil engineer, mr. paul cox, of wje associates to take the steps in the appeal, including making copulations to determine the adequacy of the supporting work structure and it necessary to provide a strengthening scheme to ensure of the safety of the supporting work structure to allow the construction of a rooftop deck that does comply with current code and safety requirements. mr. paul cox, the civil engineer, upon investigation of the supporting were structure directly below the deck found the rooftop -- found the roof support structure inadequate. mr. cox has subsequently prepared a strengthening scheme, including drawings that the permit holder has submitted to the hoa and i understand to the board of appeals but not to the department of building inspection and planning.