mr. pachecko. ex-we're upholding both permits the demolition and the site. motion from commissioner fung to uphold both permits and the condition is that they -- that the permits be revised with the revised plans dated with our stamp, january 10 2013. >> just the permit to erect the building needs to be revised, not the permit to demolish. >> do you want to separate votes? >> i think you can do one vote. >> we're upholding the site permit with the revised plan dates january 10. on that motion, from commissioner fung, president hwang? >> aye. >> thank you. commissioner hurtado is absent. vice president lazarus? >> aye. >> and commissioner honda? >> aye. >> thank you. the vote is 4-0 and the demolition permit suprahold as-is and the site performance is uphold with those revised plans. thank you. >> calling item no. 7, appeal no. 12-14 1 gration wu versus the department of building inspection, subject property at 42 lapp hamm way. appealing the imposition of a penalty on november 13th, 2012tor construction work done would you tell us a permit. >> good evening.