mr. prestowitz? >> i recently drove over the oakland bay bridge in california, which is still being built. the main span is being built in china, and the reason for that is initially, the chinese had a very low bid on the steel and fabrication. well, it turns out that they are way behind schedule and way over cost, and california is not only not saving any money, it is not generating the jobs it would have had actually procured the bridge in the u.s. >> senator murkowski? >> this goes to the chairman's question. oftentimes, if we have a buy- america program, that may add to the cost. there is another area where we may be adding to cost is when we put in place federal requirements or mandates for production of renewable fuels, whether it is through federal or state renewable energy standards, clean-energy standards that the president has proposed a new federal mandate for. the chairman has been working on some legislation. i think we recognize in an effort to comply with these requirements, sometimes