mr. sweeny now the structure is in the way. the structure is in the way of implementing the shoring of installing the foundation and maybe in the way of properly providing drainage across the site. i believe what has to happen not only do we need a plan to show the surface what it is but we had approved a surface drainage plan but how they prop to sequence securing the cut with the structure in the way. that has to be happen and be reviewed by dbi and they may ask sack to go looked at it again. it has to happen quickly. it's going to rain and a seismically that structure fortunately it's a hard rock site but the reality it's sitting there and it's barely stable under static load we need to improve it with the potential of is an earthquake. i encourage this commission and i know if the physical investigations are completed. what hadn't been done in the writing of the reports. i i know that the engineers retained by city have been out there and their site plans are finished. i know that the dbi's studies open the site have been c