ms. elisabeth waddy at the planning commission. i had questions and did present my concerns to her. i had concerns about the front setback, etc. i told her i had this information. she told me that everything had been met -- all codes. it had been through review. she was not interested in seeing the information i had, which showed proof. i did not think much about it until later, in august. that was when we receive the original plans. -- received the original plans. i would just like to say this is only a small copy of the large original plans. vice president olague: thank you. >> there is a very slight slope, but not significant enough to say that anything built downhill will not intrude on a property that is almost ground level. i do not know the exact measurement, but -- vice president olague: thank you. project sponsor, you have a couple of minutes. >> i believe what mr. pond is getting at is the top floor setback. he probably believes that he has a set back more than we do. but not everybody has to comply with the same set back. some will be set back further. some will be set ba