we can hear from ms. stott now. can take that off the overhead now. >> good evening,gc i don't have a whole lot to say. i stand by what i wrote in my briefs and what i said the last time. i believe that the planning department has been more than generous with david. i believe a lot of the delays were of his ownfpa÷ making. the original appeal was because he was running a hotel. and the use of the building, no matter -- no longer matched what was on the permit, which was a threexo!,a+xg9i6náu residential building. as far as me6f work on the 311, i'm not3:zp0Ñ quite sure exactly what 311ó understanding is when david filed an appeal before i filed mine asking for -- saying he needed more time, in case he needed more time, it was kind of in reserve, but my understandingm:( #7> was he filed an appeal, the work stopped. and in fact, when i went down and filed that appeal, i was told that the work had already been stopped -- or any motion, forward motion had already been stopped because of the appeal david had filed -- i t