and if in the nineties metropolitan filaret gave muravanka a copper roof that saved building, partly, then the facades nevertheless began to lose the face of the wall. needed surgical disinfection. everything was zamakshee there were issues with the roof. it soaked up all the moisture. that is, the fungus appeared everywhere. it was all destroyed, the upper part was removed. she, in principle, almost did not hold on. there is such a destroyed brick. it was already tilted a little, the restoration today is extremely, timely and the first work in the history of independent belarus, for which half a million rubles have been allocated from the president's fund, have been carried out since the end of august, here already reinforced and shifted the brick of lime mortar. the composition is almost like during the construction of a mundane castle. here we are looking at this tower, which, probably, to the layman who does not understand in res everything would say that no one made it. she is fully prepared once they threw cores at her. uh, uh, all of this has been preserved, that is , the brick