belas is heading towards elektra, nevypadkova, that the city itself chose the project to replace dieselhines for zhodzen’s roasting are created at their place. there are already three bastards here in the workshop for assembling passenger electric vehicles at the minsk automobile plant. electric buses will be contaminated once a day at the depot. now we have an order of 14. equipment, uh, some are shipped before the end of this year, some in the first quarter of next year, the colors are bright, three-color, three colors blue, white, black with our signature image of a bison on the roof, since the equipment is new and we will make some modifications to improve the design here on site, for this project changes are being made throughout the city, even stopping points will be made in the same style as our technology. zhodzina can produce up to 300 units of electric transport per year, which is significant, as it allows for access to a wide range of export areas, so in the current and current times of supremacy with the regions of the state. contract with the city of kazan, delivery of 25 m