from our mocking son power house into newark and so with the 3 connects we have to the grid that newark oakdale and warrensville we have options we don't necessarily need how you all the transition lines we have today that is a pressure on t us a challenge our transition assets maybe uneconomic for us to operation and the pg&e enter miblz with the transition serve only pg&e we pay pg&e for that service and have open access and pg&e has open assess requirements that works to our favor with the extradition of your interconnection agreement that presents an opportunity and moving to the expeditiously challenge our water first policy we have basically on the power side n an operating realty the water first policy reduce our operating operations responsiveness to the power needs because power is really treated as a biproduct of water delivery so as we see dissected our water neatest over generation and we're less able to match our supply with our demand less able to respond and in the swhoelt market we'll see a wholesale price spike if we're not in need of water we can't take advantage of the genera