contractors into her unit, on may 13, to do the work, not on a 11 when i was there to inspect, she newhall when the contractor was going to be doing. while the contractor was working on the downstairs unit, adjust for the information of the board, there are three units in three sacks in the building. in a 340 is the ground floor unit. 342 is even floor unit, and let my contractor was working in unit 340 and had demolished the ceiling, he saw that the four was rotted and unsafe. he has provided a declaration in the packet provided to you. officially the exhibits quickly taken with my camera fun. they are not the best pictures. that is why i went to the unit, and that is what i saw. if it was only a $2.50 fix, we gladly would have done that. instead, we began demolition work hot pudding in a brand-new bathroom. when she talks about lead paint, not one service was touched. and when she moved into her unit, the wolves -- walls are as they were now where she made them that way. and the kitchen an. [chime] commissioner garcia: when you dealt with the individual -- >> i did not. commissioner garc