calling item 6, appeal 11-004, jeff and nicole cooper, protesting the issuance on september 8, 2010 to nextg network a wireless box permit. it is on the calendar today. starting with the appellants. >> my name is jeff cooper. my wife and i own a home. we are appealing the permit that allowed nextg to install wireless equipment on our block. in our jurisdiction and request a hearing on generic of 2011, nextg said, "we are a nation of laws." it said is heard -- it said it is her job -- she said it was her job to make sure the law was followed. the law was not perfect but followed in this instance. the p.w. made a statement affirming a mistake was made. this is a good view street. as a result, the planning department review is required. this review did not happen. what does this mean? it means that nextg has partly constructed an antenna at a location where the permit was issued incorrectly. this is exactly when notification needs to occur. if there had been minimum outreach, we would have had the opportunity to research these issues before the end tunnel was built. -- the antenna was bui