the north facade, the wall was to remain. and for the most part, it did. that wall remained in place, which you can see from the picture that represents it in place based on how the site conditions are right now. the south elevation is a little bit different, because if you look at the south elevation you'll see that the matched area right there was being . >> there was minimal demolition at the area of the facade. next steps permit application under review by the planning department appears to document the conditions and the changes needed to ensure compliance with the notice of violation. we conducted site visits out there together, and we reviewed what was being proposed for submittal and comparedcompared those documents. work will be scheduled for review and getting directions to the contractor or stakeholder and i'm going to suggest that we will conduct weekly inspections until we see that the stakeholder and the contractor are back on track and we eliminate the possibility of anything going sideways moving forward with the project. that's my presenta