>>nothigisncon betweencesindsoutheas ist oceaide t was designedorheaximum earthquake t san andreas fault ne. thlant on outheast is on y ouldasily ha flu tsoutheast. type of thing. ming on to the next one, i want to talk about the land required for a new project. a lot of time was spent looking at sites in talking about property. the area needed for the digesters for the bio solid treatment is about 10 acres. the digesters themselves take up the footprint of about two acres. with the water and gas storage and capturing the gas to create screen power -- we can use the green power on site. we have a generation system at both sites. we want to optimize the power and have more green power that can be consud athe pnt. supervor maxwell: ishat is what w're cng resource recovery? welllookthe stnduse tm? most cefctivsystem gas.es of the gas --esthe inthplaces, it s atr vecle fueor wewillook at all those ings i terms of cost and life cycle. an additional 5 acres would be required in the future for drying if we were to move towards that. that would be using solids locally within the city. several of