the study area had is that essentially from the embarcadero to octavia boulevard. ent repaving is scheduled from stewart to van ness. as a team, we determined octavia is a functional breaking point. the design of market street as it moves west changes that octavia. we want to be inclusive of that in our planning, even if the paving does not continue in that direction. i wanted to add, we acknowledge on the southern end of market street, there is a lot of overlap, in terms of project needs. we have included those three blocks to the south to make sure that we are being inclusive, from a transportation perspective. the three main goals of the project are making market street the signature sustainable street in san francisco and the bay area, creating a memorable identity, the ability to promenade in a vibrant public space. clearly, market street is a key corridor, so optimizing sustainability mobility modes is a party for all users of the street. economic development. insuring plans are coo with the market redevelopment efforts. we are trying to foster an economically