8
8.0
Sep 25, 2024
09/24
by
ESPRESO
tv
eye 8
favorite 0
quote 0
turned upside down, in fact. the fact is as follows: there are about 80 major facilities managed by okrenergo. ukrenergo is a company that transports electricity through main networks and has... several dozen substations that just deliver electricity from the main network to the oblenergo network, and already about 70 ukrenergo facilities have storage facilities for the most critical type of equipment, these are autotransformers, these actually those large machines, such large devices, which convert the voltage from a very high mains voltage of 330 00 to 750 00 into a voltage that is characteristic of distribution ones. networks that reach every house and all 17 million subscribers that currently exist in ukraine. these autotransformers, as many probably know, were the objects of attacks in 22, 23, and in 24, the russians quite actively tried to attack them with shaheds. therefore, anti-shached protection is built on the absolute majority of our objects. i would say such cynicism and the paradox of the situation is that on no other. objects of critical infrastructure in this country, protecti
turned upside down, in fact. the fact is as follows: there are about 80 major facilities managed by okrenergo. ukrenergo is a company that transports electricity through main networks and has... several dozen substations that just deliver electricity from the main network to the oblenergo network, and already about 70 ukrenergo facilities have storage facilities for the most critical type of equipment, these are autotransformers, these actually those large machines, such large devices, which...
8
8.0
Sep 22, 2024
09/24
by
ESPRESO
tv
eye 8
favorite 0
quote 0
turned upside down actually. the fact is as follows: there are about 80 main facilities operated by okrenergo, ukrenergo is a company that transports electricity through main networks and has several dozen substations that just deliver electricity from the main network to the oblenergo network, and already about 70 of ukrenergo facilities have storage facilities for the most critical type of equipment, these are autotransformers, these are... actually those big machines, such big devices that convert the voltage from a very high mains voltage of 330 00 to 750 00 in voltage, which is characteristic of distribution networks that reach every house and all 17 million subscribers that currently exist in ukraine. these autotransformers, as many probably know, were the objects of attack in the 22nd, 23rd years, and in the 24th year, the russians also quite... actively tried to attack them with shaheds, so anti-shahed defense was built on the absolute majority of our ob objects i would say such cynicism and the paradox of the situation is that at no other critical infrastructure facility in this coun
turned upside down actually. the fact is as follows: there are about 80 main facilities operated by okrenergo, ukrenergo is a company that transports electricity through main networks and has several dozen substations that just deliver electricity from the main network to the oblenergo network, and already about 70 of ukrenergo facilities have storage facilities for the most critical type of equipment, these are autotransformers, these are... actually those big machines, such big devices that...
6
6.0
Sep 27, 2024
09/24
by
ESPRESO
tv
eye 6
favorite 0
quote 0
and impractical, so they only defend themselves critical elements of each object, well, for the okrenergoion, as well as for power plants, by the way, one of the critical elements is the autotransformers, which convert the voltage from a higher class to a lower one, so that this electricity can be further transport already to citizens, to industrial enterprises, to hospitals, to schools, kindergartens, and so on, respectively, when there is damage either by a missile or a drone of a pebble from some... objects , some temporary shutdowns are possible while the repair crews fix the equipment that is not critical, which can be quickly replaced, but the main thing is to secure the most complex, the most expensive equipment, which takes a very long time to replace, it can take weeks, even months, and that is what this program for the protection of power facilities is focused on, if to talk about what still needs to be done before winter, of course, now it is necessary to focus on the protection, engineering protection of our power plants in such an emergency, urgent... has come, it is neverthe
and impractical, so they only defend themselves critical elements of each object, well, for the okrenergoion, as well as for power plants, by the way, one of the critical elements is the autotransformers, which convert the voltage from a higher class to a lower one, so that this electricity can be further transport already to citizens, to industrial enterprises, to hospitals, to schools, kindergartens, and so on, respectively, when there is damage either by a missile or a drone of a pebble from...
6
6.0
Sep 19, 2024
09/24
by
ESPRESO
tv
eye 6
favorite 0
quote 0
okrenergo does not see new power units in your strategy, and why? well, because now , after 9 g were destroyed, for six months in ukraine, we have no reserves, and we need them. pass the winter, and for example, from the promises promised to the president by the minister, 1 gas, both piston and other, only 60 megawatts of the 1000 megawatts were built by winter, 60 more, and why so, when this figure was announced, it was promising, it must have been calculated, i don’t know what can be done before winter, i don’t i'm sure that she was miscalculated because i only see energy pr. president zelensky said, i i don't like energy pr, but there is energy pr, because i see these appeasement statements, galushchenko, kotin, that's all, in fact, her gas turbine plant, which was a gift from the us government in december 23, was installed only in june of this year, 24 mv. commissioned by the minister. it is to be installed, and this is a demonstrative example, that is, in the future, of course, you can count on the construction of new nuclear power plants, as i
okrenergo does not see new power units in your strategy, and why? well, because now , after 9 g were destroyed, for six months in ukraine, we have no reserves, and we need them. pass the winter, and for example, from the promises promised to the president by the minister, 1 gas, both piston and other, only 60 megawatts of the 1000 megawatts were built by winter, 60 more, and why so, when this figure was announced, it was promising, it must have been calculated, i don’t know what can be done...
4
4.0
Sep 26, 2024
09/24
by
ESPRESO
tv
eye 4
favorite 0
quote 0
and impractical, therefore only the critical elements of each object are protected, well, for the okrenergoion, as well as for power plants, by the way, one of the critical elements is the autotransformers that convert the voltage from a higher class to a lower one in order to be able to further transport this electricity to citizens, to industrial enterprises, to hospitals, to schools, kindergartens, and so on, respectively, when there is damage either by a missile or by a drone of a kamika from some facility, some temporary outages are possible while repair crews fix non-critical equipment that can be replaced quickly, but the most important thing is to secure the most complex, most expensive equipment that takes a very long time to replace, it can take weeks, even months, and this is exactly the focus... if we talk about what still needs to be done before winter, of course, now it is necessary to focus on the protection, engineering protection of our power plants in such an urgent, urgent manner , because if the ukrenergo network historically has a large margin of strength and even today
and impractical, therefore only the critical elements of each object are protected, well, for the okrenergoion, as well as for power plants, by the way, one of the critical elements is the autotransformers that convert the voltage from a higher class to a lower one in order to be able to further transport this electricity to citizens, to industrial enterprises, to hospitals, to schools, kindergartens, and so on, respectively, when there is damage either by a missile or by a drone of a kamika...
10
10.0
Sep 20, 2024
09/24
by
ESPRESO
tv
eye 10
favorite 0
quote 0
i will repeat once again that it has nothing to do with the bad or good protection of the okrenergo substation, this situation does not exist, it is a complete absurdity, and this is just an obvious desire. operational activities of the company, attempts to do so control began back in the 21st year, controlling the money yes, controlling the money, controlling some, i don't know, personnel appointments within the company, and already in the 21st year, active attempts began there to offer me very good people for various positions in the company's management , which i rejected, there were attempts to change the management of the company outside the supervisory board, and... in the 21st year, already during the invasion and in the midst of the invasion, there were attempts to change the board once again, there were attempts to dictate, for example, the sequence of debt payments on the electricity market energy, that is, there were quite lively attempts to interfere in our activities, yes, with documents, with official letters, orders, and so on, and we never once succumbed to these attempts, they
i will repeat once again that it has nothing to do with the bad or good protection of the okrenergo substation, this situation does not exist, it is a complete absurdity, and this is just an obvious desire. operational activities of the company, attempts to do so control began back in the 21st year, controlling the money yes, controlling the money, controlling some, i don't know, personnel appointments within the company, and already in the 21st year, active attempts began there to offer me...
4
4.0
Sep 26, 2024
09/24
by
ESPRESO
tv
eye 4
favorite 0
quote 0
related to the generation of power, and aes cannot work if they are not in a working condition, then okrenergo has such reserve, and in okenergaatami no, it is next to the ac, these are located from. because they were engaged in some preparatory work for the construction of x3 x4, they bought and repaired some crane for uah 215 million, some construction wagons, etc., but they did not create stocks of transformers for their as, and these, for example, burned down at the same time in july in a day, two transformers of the southern ukrainian as, and i saw that they... announced a tender for the purchase of transformers, fired the director, appointed another, but the problem is not solved, if we are actually talking about terms, returning to my question, if it is necessary to stop the work of the as, then how many hours, days, weeks, months is possible , yes, i cannot provide such forecasts, unfortunately, because there are a lot of undetermined factors, well, ms. olga , we are optimists, yes, we hope... that someone will come there, you know, in a yellow car, with such a booth on top, and fix ev
related to the generation of power, and aes cannot work if they are not in a working condition, then okrenergo has such reserve, and in okenergaatami no, it is next to the ac, these are located from. because they were engaged in some preparatory work for the construction of x3 x4, they bought and repaired some crane for uah 215 million, some construction wagons, etc., but they did not create stocks of transformers for their as, and these, for example, burned down at the same time in july in a...
13
13
Sep 18, 2024
09/24
by
ESPRESO
tv
eye 13
favorite 0
quote 0
to 5 gw of a wind power plant, and 1,000 megawatts are storage batteries for balancing, that is , okrenergoot see new energy units in his strategy. and why well, because now , after 9 gvs were destroyed within six months in ukraine, we have no reserves, and we have to go through the winter, and, for example, only 60 of the gas, gas-piston, and other gas-powered ones promised to the ministers by the president were built before the winter mw, from 1000 megawatts to 60, moreover. so when this figure was announced , it was promising, it must have been miscalculated, i don’t know what can be done before winter, i’m not sure that it was miscalculated, because all i see is energy pr, president zelenskyy said, i don’t like energy pr, but well, there is an energy pr, because i see these statements are reassuring, galushchenko, kotina, everything is there, in fact it is a gas turbine installation. which was presented by the us government in december 23rd year, was installed only in june of this year, 24 mw, the minister instructed to install it, and this is a demonstrative example, that is, in the fu
to 5 gw of a wind power plant, and 1,000 megawatts are storage batteries for balancing, that is , okrenergoot see new energy units in his strategy. and why well, because now , after 9 gvs were destroyed within six months in ukraine, we have no reserves, and we have to go through the winter, and, for example, only 60 of the gas, gas-piston, and other gas-powered ones promised to the ministers by the president were built before the winter mw, from 1000 megawatts to 60, moreover. so when this...
10
10.0
Sep 10, 2024
09/24
by
ESPRESO
tv
eye 10
favorite 0
quote 0
this system, well, it survived, at the same time, i just ask that all the stones that are thrown at okrenergoesponsible for, for example, covering the units, for closing the open distribution sites at nuclear plants, and they are not responsible for covering the blocks at... thermal power plants that were bombed, they deal with transmission systems, these are other things, it is simple and very important to understand that at least last week, when, when minister galushchenko already spoke, in the parliament it was mentioned that more than 80% of all ukrenergo facilities are protected, closed, and it turns out that this is very good, but...
this system, well, it survived, at the same time, i just ask that all the stones that are thrown at okrenergoesponsible for, for example, covering the units, for closing the open distribution sites at nuclear plants, and they are not responsible for covering the blocks at... thermal power plants that were bombed, they deal with transmission systems, these are other things, it is simple and very important to understand that at least last week, when, when minister galushchenko already spoke, in...
4
4.0
Sep 26, 2024
09/24
by
ESPRESO
tv
eye 4
favorite 0
quote 0
impossible and impractical, so only the critical elements of each object are protected, well, for the okrenergos well as for power plants, by the way, autotransformers are one of such critical elements, which convert the voltage from a higher class to a lower one, in order to be able to further transport this electricity to citizens, to industrial enterprises, to hospitals, to schools, kindergartens, and so on further. er, accordingly, when there is a strike, either by a missile or by a kamikat drone from some facility, there may be some temporary outages while repair crews fix the non -critical equipment that can be quickly replaced, but the main thing is to secure the most complex, the most expensive equipment, which takes a very long time to replace, it can take weeks, even months, and this is exactly what this energy facility protection program is focused on. if we talk about what still needs to be done before winter, of course, now it is necessary to focus on protection, engineering protection of ours in such an emergency, urgent order. power plant, because if the ukrenergo network histori
impossible and impractical, so only the critical elements of each object are protected, well, for the okrenergos well as for power plants, by the way, autotransformers are one of such critical elements, which convert the voltage from a higher class to a lower one, in order to be able to further transport this electricity to citizens, to industrial enterprises, to hospitals, to schools, kindergartens, and so on further. er, accordingly, when there is a strike, either by a missile or by a kamikat...
7
7.0
Sep 21, 2024
09/24
by
ESPRESO
tv
eye 7
favorite 0
quote 0
impractical, so they defend themselves only the critical elements of each object, well, for the okrenergoation. as well as for power plants, by the way, autotransformers are one of the critical elements, which convert the voltage from a higher class to a lower one, in order to be able to transport this electricity further already to citizens, to industrial enterprises, to hospitals, to schools, kindergartens and so on, respectively, when there is damage either by a missile or a kamikat drone from some object, some temporary shutdowns are possible, while the repair crews... they fix the non-critical equipment that can be quickly replaced, but the most important thing is to secure the most complex, the most expensive equipment that takes a very long time to replace, it can take weeks, even months, and that's what this protection program is focused on energy facilities, if we talk about what still needs to be done before winter, of course, now it is necessary to focus on protection, engineering protection in such an emergency and urgent manner. of our power plants, because if the ukrenergo n
impractical, so they defend themselves only the critical elements of each object, well, for the okrenergoation. as well as for power plants, by the way, autotransformers are one of the critical elements, which convert the voltage from a higher class to a lower one, in order to be able to transport this electricity further already to citizens, to industrial enterprises, to hospitals, to schools, kindergartens and so on, respectively, when there is damage either by a missile or a kamikat drone...