house are currently underway, the head of the department for the operation of heat networks, oleksandr pylypyshin general, restoration works are currently being carried out in six areas, the city's infrastructure was destroyed due to russian shelling , in total, more than 11 km are planned to be replaced heat network this will provide heat for more than 20,000 residents well, we are doing everything in order to be in time for the beginning of the heating season well, we are aiming for october 15 that is, if we make it earlier if the weather allows us well, but we have everything in order to finish these works on time, catherine with a bottle , a plastic bottle on ice, we have a blanket in the seam, this is my insulation, i bought this one, if the water is turned off, i drank the heating boiler, if the water is turned on может свет не отключат but even if i cover my hands, more than 60% of the capital's residents are provided with heating and hot water by the capacities of kyiv thermal power plants-5 and thermal power plants-6, the rest are provided by boiler houses in the capital 184 the city aut