crewses cooperation with cmd, olse, local hire, oewd which is the local hiring program. and many, many issues that have to do with the constructability and com plitionv with chapter 6.62 of the admin code. construction issues, construction management itself has always resided in the field. the joc program is a part of the cmb of the puc and the constructability is always resided in the field. and after the audit sort of targeted the joc management team as having not enough construction oversight. but as you can imagine to be able to accomplish the type of volume you're doing here between 25 to $30 million annually, we have to kind of keep some of these things separated. so, although joc has oversight on a lot of those issues, the constructability and cm and inspection process typically resides in the field. so, the audit kind of led us into a restructuring, as it were, of how work is managed at puc under the joc program. some of these things are being put into place and i will admit that some of the recommendations of the auditor made are fine and i think are substantial