me a procedure that will allow us to put it a drill pipe into the blowout preventer with a camera onyx and conduct a fishing experiment. the fishing experiment is to ascertain the existence location of the drill pipe that might remain in the blowout preventer. when we cut the riser pipe back before we removed the pipe and with the capping stack on, we were concerned that there might be a pipe in their or possibly o we will know exactly how to see it. the second step will be to ascertain the location. i expect we will get a procedure for bp the work on this today has been extensive. it has involved the science team. they have been involved in the development of the procedures that will be conducted and we have also been in touch with the department of justice. we will make sure if there were issues. following that, we will look at a salvage plan. this will become material to the joint investigation team. that is being coordinated with the department of justice. as we stand this morning, the ambient pressure in the well is 2,189 pounds per square inch and that has not varied since the te