paul robeson malcolm x., this is our fourth school we had been placed in.h school is getting progressively worse. being now a k-8 school housed in a building that was originally built for k through five. everything is primarily on a small scale. when you look at the roof that has gone neglected -- the electrical infrastructure. we have all of this high tech equipment trying to interface and infuse into the school system but you have a building that does not carry the kind of electrical load. even if you get the technology in their, there's a good chance it will not work. far as e structe of the building -- we look at the windows for schools back in the 1940's, 1950's. these windows are still in place. there might have been upgrade here and there but between the water system, the pipes, the plumbing. one water system we had i had to prevent the children from drinking from that water back in 2012 we moved into the building because i noticed the orange yellowish tint coming out of the faucet. i made the administration aware but the only thing they did was to t