and to you prozorov nina khoreva irina bliznyuk and pavel bonya channel one rostec has released the first serial high -capacity turbine of almost 120 mw, it will operate at power plants instead of foreign counterparts gtd-110m. the first copy will go to the krasnodar territory, where they have been building test-impact engines since 24, the united engines construction corporation, which is part of rostec, plans to produce two such turbines a year, according to experts, they are in no way inferior to similar foreign installations, but smaller in size and weight due to this, it is easier to deliver them to the place of work. there are other advantages of the installation. it works in a completely unique way. it works both on gas-fueled gas and e-liquid fuel, which means that it has very good technological performance. it is easy to mount. it is easily operated from the point of view of the remarkable substitutability of some structures and parts. this gives certain advantages during its operation, of course, the consumer is waiting for us its a very long time ago. the present and future of