i'm peter louie, the respondent. i'd just like to point out a few things that i failed to do in my brief. this is the -- the notice of violation that i first received after the appellant's complaint, and it clearly states on the corrective action that a permit is not required and so that's the reason why a permit was not taken in the beginning. i would also like to show this picture. this is the appellant's property, his wall, right here. this is the retaining wall on my property which held back the dirt, which he called the planter box, and there was a channel in between here which was filled with concrete, i believe, in 2010-2011 by his predecessor, who had the same leak that the appellant had last year. and i, unfortunately, allowed that neighbor to fill that channel with concrete. he claimed that that would stop his leak. and when inspector duffy came, the notice of violation was because we no longer had this air gap, so the original plan was to remove the concrete that had been poured by his predecessor. obvious