here and there over this, particularly with people in dog patch and the crow hill -- petro hill -- peterog to move forward, only if the projectç itself mos forward. i also have been fortunate enough to have been on high- speed rail in europe and asia, and it works. it works fantastically. i see no reason why it would not work here. commissioner more -- moore? commissioner moore:ç i am generally in support of the statements made. w3i do support the level of detail they are touching on, whicht( i assume would be impli, that does not only apply to the final product of high speed rail, but applies to the electrified portions we currently have as well, because the two pieces are part of the same strategy. what i wouldç hope is that -- i am not trying to hector the pr))q(u -- is this the way of high speed longer than expected, with the transbay terminal as the endpoint for high speed regional rail -- with the commencement and building up of the terminal, that would not only occur at higher speeds. higher speeds is enough to start doing it. commissioner borden:ç i wantedo concur with commiss