it another plosaj in so it doubled it. understood, and i agree.- understood, and i agree.ed according to that bullet point in — reported according to that bullet point in april and affixed to the problem — point in april and affixed to the problem caused by the earlier fix was applied in may 2003. —— another plus sign _ was applied in may 2003. —— another plus sign. could we look at the fourth — plus sign. could we look at the fourth bug, page 119. this is the data to rebuild failure and if— this is the data to rebuild failure and if this— this is the data to rebuild failure and if this is split into a number of sub— and if this is split into a number of sub issues. this is issue one, the only— of sub issues. this is issue one, the only one _ of sub issues. this is issue one, the only one i'm going to address. second _ the only one i'm going to address. second bullet point, fujitsu understands this issue was first reported — understands this issue was first reported to a branch on the 10th of november— reported to a branch on the 10th of november 1999. after a discrepancy