pokulki, i'm so. uncover let's say your horse, well, right now on the roads against the wind.nd now our beauty looms on the horizon. she is really very beautiful, our belarusian deputy chief engineer for the repair of the belarusian nuclear power plant. when i first arrived at the construction site, i was somehow impressed by the number of cranes there, there were about 50 pieces in the area of the first power unit. imagine the forest that was. i've never experienced anything like this and it was great. and surprisingly of course, watch. my area of responsibility is the division that is directly in the aggregate of its repair service, which is achieved by pursuing a policy on a preventive maintenance plan. ivanovic registration of cranes branch for today or tomorrow is scheduled to check the troubleshooting. indeed, such a question has a place to be, because the station. our service is one of the main areas that ensure the safety and quality of repairs. this is lion's share in ensuring the safe operation of the nuclear power plant. equipment that has undergone some kind of