we are on the bush development drilling site 301u of the priokskoye field, this drilling rig was launched. this is a tool for drilling wells, usually it has six blades, but here it has five and the efficiency is immediately higher by a quarter. the drilling unit is always faced with the task of optimizing processes to achieve results with the help of patriotic innovative technologies. last year, we managed to achieve a record in the oil and gas industry for the removal of rock samples . kern e for two runs was selected 60 m. oe rock samples earlier this type of work took about 10 trips. that is, we reduced the well drilling cycle and the cost of the well itself by a day. in terms of the rational use of associated petroleum gas, it stands out in the oil production of the priokskoye field, among the domestic leaders, the local power plant operating on this gas, the most powerful in the country, 329 mw. for example, i can say that the capacity of our station is enough to cover the need for electricity in the city up to half a million. it should be noted that the cost of our generated electri