SFGTV: San Francisco Government Television
81
81
Mar 19, 2011
03/11
by
SFGTV
tv
eye 81
favorite 0
quote 0
everything from radiofrequency to the engineering drawings. when the sides are complete, when there is an inspection, if anything is out of line, of course there is instructions to correct that immediately or else the permit will be suspended. as mentioned, we're still in the process definition of the final details because of the communication which we have caught and are rectifying. when this site is complete, it will be fully inspected by the bureau inspector. for the electrical side and the warning label that was shown by the appellant belongs to specific gas and electric. that is over all electric meters. having electricity has a warning label to let people know there is electricity. our signs are green and they say notice. this is a requirement to know people cost notify people when there is any type of radio frequency. the warning is for the power. regarding the electrical aspect, we work with the department of building inspection and electrical division to look out and inspect the box and they issue a green tag. that says that everythin
everything from radiofrequency to the engineering drawings. when the sides are complete, when there is an inspection, if anything is out of line, of course there is instructions to correct that immediately or else the permit will be suspended. as mentioned, we're still in the process definition of the final details because of the communication which we have caught and are rectifying. when this site is complete, it will be fully inspected by the bureau inspector. for the electrical side and the...
SFGTV2: San Francisco Government Television
144
144
Mar 24, 2011
03/11
by
SFGTV2
tv
eye 144
favorite 0
quote 0
with me is a licensed engineer whose firm prepared the radiofrequency commission report. he is here today as an independent third-party evaluator to respond to concerns are health issues. we would request that you conditionally approve the project. i am happy to respond to any questions you or members of the public may have. president olague: i would like to open it up to public comment at this time. seeing none, public comment is closed. vice president miguel: i have one question, if i may. i am asked this all the time and i am unable to give an intelligent answer. we keep hearing 3g and 4g. what is the g? >> i think generation. i think it is a sequence of generations. 2g was the second wave, and so on. vice president miguel: but it has to have an actual valuation of some kind, i would assume. >> i am not familiar enough with the technology to respond. vice president miguel: thank you. commissioner antonini: move to approve. commissioner borden: second. >> emotion on the floor is for approval. -- the motion on the floor is for approval. commissioner moore: no. >> that mo
with me is a licensed engineer whose firm prepared the radiofrequency commission report. he is here today as an independent third-party evaluator to respond to concerns are health issues. we would request that you conditionally approve the project. i am happy to respond to any questions you or members of the public may have. president olague: i would like to open it up to public comment at this time. seeing none, public comment is closed. vice president miguel: i have one question, if i may. i...
SFGTV: San Francisco Government Television
78
78
Mar 19, 2011
03/11
by
SFGTV
tv
eye 78
favorite 0
quote 0
my radiofrequency engineer can answer this better. this needs to be above the houses and the trees so that this signal propagates to the coverage area. you do need it for height but if you lowered it so that was plush -- flush with the poll extension, we have looked at it and we don't think that it would be that much of a loss of a signal because this is only two foot or so. sometimes, it looks better when it is hire because it would be wider than other advantages to have it on the side rather than on the top. it would be effectively hidden. in this situation, flush mounting seems to be the clear configuration. >> thank you. >> how many pieces of equipment go with this permit? the antenna and one in closure? >> yes. >> under the ordinance, only one internet and one ordinance. >> maybe you said what i'm getting ready to s p but my impression is right now the box under the current law or maybe even under the whole law would not conform to the proper dimensions. this is about two inches unless you can justify because of switches and othe
my radiofrequency engineer can answer this better. this needs to be above the houses and the trees so that this signal propagates to the coverage area. you do need it for height but if you lowered it so that was plush -- flush with the poll extension, we have looked at it and we don't think that it would be that much of a loss of a signal because this is only two foot or so. sometimes, it looks better when it is hire because it would be wider than other advantages to have it on the side rather...