my name's randy collins, a structural engineer under contract with shane bush since about february. quite frankly, this is a complicated project. but we've been doing project like this in san francisco since the 1920's. so that's why structural engineers are here, that's why geotechnical engineers are here, that's why we're working with a contractor that's been around for 25 years. the procedure we're using here is very well established in san francisco. the shoring and the methodologies that we're using to construct this is very tedious and very time-consuming because we're only going to excavate four feet at a time. and then construct temporary construction, temporary structures to completely brace four feet at a time, and then another four feet, another four feet. once that temporary structure, which is completely designed for all permanent load cases, once that temporary structure is built, we're then going to build anywhere from 12 inch thick to 18 inch thick concrete walls, ceilings, and foundations, to support the final building condition. so i've written a letter that addres