you know, again today, the city has a contract with them to actually pick up the food waste, and recology has indicated that they do not have the capacity to segregate the food in the city and so they transport it by truck and they are planning to build a digester in vacaville and to feed the fuel of the truck that are being used to transport. and so we have the capacity, for high strength waste, and if we were to get a full high strength waste, we can certainly process it, but challenges that we see, and that we have seen everywhere including in oslow is for the high strength waste to be effective it needs to be 100 percent organic and there needs to be a diligent process prelined to be sure that none of the organic processes have been taken out, the most common are forks and knives and plates that have been thrown in on accident. >> and is that different than green waste? which might have even more potential? >> we did not look at green waste, as an option. and none of the plants that we went to, processed green waste. but i can tell you as an example, daily in manchester, one of the te