was seismic, order control, great removal, refurbishing of the existing out wall, whitewater pomp rienzi, and system improvements. these projects totaled $624 million and have and $11 impact on the average monthly bill in 2032. having completed the treatment plant summary, we turned to the collection system. we initially focused on reliability systemwide. we then look that particular issues associated with bayside, the west side, and green infrastructure, which as you recall, we made a $400 million commitment to. systemwide recommendations include operational improvements, a pump station rehabilitation, combined super discharge out wall structural improvements and backflow prevention where needed, and odor prevention sites throughout the system. these projects totaled $838 million and we have a $14 per month impact on the average monthly bill. when we looked at the bayside system, you may remember the drivers were concerned with. there is replacement or redundancy, regulatory compliance to get initially to the recurrence of 10 recurrences per year, but also redundancy in the future antic