we agreed with rosavtodor that they will start designing there this year, so most likely, well, we understandslo is underway, this is still a tool, accordingly, this is a road to achieve goals there, a land corridor and so on, a lot of heavy equipment is on the way, so now even to carry out repairs in such weather and in such heat , everything will be pushed through, that is, in this case , a new one, so we are working on it, the design documentation is being prepared, it’s just inside the city that we are already carrying out a complete overhaul in the city limits, the road will be brought into line... the entire transport zone, the transport group will look completely different, we will finish it by september 1, there are some new electrical substations, will be built or enough, large ones are enough, there are no problems here, here are small ones, that is, where there are locked capacities, where the capacity of the transformer substations is limited, where the capacity of the transformer substations is limited, respectively, that is, as it were, reconstructions and similar transformer su