the capacity of rosh caspian railway is expected to transport 5 million tons of cargo and 1.4 million passengers in the first year of operation. railway construction. the reason for the long implementation of this plan is to give priority to other projects, including the ghazvin railway, are growing . to reach anzali, but due to the fact that we were forced to reach anzali with problems , we changed the route from the area called pirbazar to the caspian port. the construction of this project began in earnest in 1997, a line with 18 intersections and large bridges and 243 the waterway has been built along the 35 kilometers that we traveled, with about 18 intersections or large bridges. these bridges, for example, are 6 to 7 meters high , some of which are the tallest, nearly 270 meters high, which are built on the main anzali road. we have been working rapidly since 1997. with the operation of this 37-kilometer railway line, the caspian-persian gulf railway connection has been established for the first time, and the economic relations between eurasia and the southern countries of the p