in the very north of the taimyr peninsula, and the rosneft vostok oil company is part of the project, the pace of development is unprecedented for the russian oil and gas industry, we have five drilling rigs here operational installations installed, but should not go out one by one in parallel to start working in parallel and operating time. exploratory drilling continues at neftyanik in the third generation. karen pashinyan talks about how the north was mastered in the seventies, after all, the trap, 50-degree frosts. since then, the conditions have not changed. but production is carried out using unique drilling complexes, thanks to the full shelter and its own heat generators, the unit is operated in all weather conditions environmentally friendly, clean, closed production cycle is still oil. he proudly shows his assistant, the bashkir robot temirkul, and a high-tech control panel for the drilling rig. here we can observe absolutely everything, and in our mine everything is duplicated with the help of cameras, b, everything is also duplicated in our mine. at our interface, drilling