was given by the governor of the ryazan region , pavel malkov, director general of the rosseti center, igor makovskysubstation, the most modern equipment in the country is used exclusively by russian, it is not only a high-tech substation, which is unique for the region in terms of its innovative solutions. here are collected all the advanced technologies of the fifth generation, which are applicable today in the framework of secondary equipment within the framework of primary equipment, the uniqueness is that the stations require maintenance. all signals are output to the unified power grid control center, and from there the substation is already centrally controlled with a maximum power of 80 mw, ampere 7% for this mode, they are not, no comments, the kid is ready to turn it on for 10 calories of development under normal. so ready to be included in the normal work, we are starting to commission the work of the airborne forces , the station will become the center of a whole modern town, this is an industrial park of 560 hectares. now here it is almost formed. necessary infrastructure today. already