electricity imbalance in the country will be solved by connecting the combined cycle power plant of rudashor zarandieh to the national electricity grid. according to the minister of energy, with the plans made in the summer of next year , this power plant unit will be put into operation, all the equipment has been brought to the power plant site and is being installed . let's reach central province and actually tehran province, because these two provinces have the highest so-called consumption needs especially the industries located in these two provinces require us to solve part of our imbalance by connecting this power plant to the national electricity grid. the national oil company announced a one and a half times increase in the production of the south azadegan common field in the last two years. the daily oil production capacity of south azadegan field was 82 thousand barrels at the beginning of the 13th government. south azadegan square is located 80 km west of ahvaz and near the iraqi border. it has been added to the production capacity from azadegan field, so that its production has reached ab