i also looked very carefully at russ bengston's radio report that reported the service gaps and the lack of the capacity and the three-page memo that we had as exhibit c from a number of documents. to me, it lacked showing there was a capacity problem. in many ways, some of the questions i asked at the last meeting for methodology and the number of calls made her versus the number of call failures -- i do not feel like there was enough information to show me that the project sponsor hazmat is a burden of -- had met its burden. in addition, there was quite a bit of information from a number of exhibits that they showed. and although the project sponsor claims that it is not scientific and not checked, i feel like the information in here is, in a sense, we have to question three-page study is done by radio engineers from verizon. we need to not just rely on the technology data done by product sponsor but you have an independent way to look at data. i will be working to look at ways we can address this at the city wide level. in my opinion, after looking at all the evidence, it seems that t